Additionally, all our production procedures are in compliance with ISO9002 standards for a specialized supplier of a full range of chains, sprockets, gears, gear racks, V-belts, couplings and reducers, pto shaft, agricultural gearboxes….
Overview
Quick Details
- After Warranty Service:
-
Video technical support
- Local Service Location:
-
Egypt
- Showroom Location:
-
Egypt
- Type:
-
parts
- After-sales Service Provided:
-
Video technical support
Supply Ability
- Supply Ability:
- 30000 Piece/Pieces per Month
Packaging & Delivery
- Packaging Details
- Carton or Plywood case or PALLET
- Port
- NINGBO / SHANGHAI CHINA
Online Customization
2016 Great power power steering units priority valve , power steering units
VLSA type Priority valve is a fixed differential reducing components, and supporting the sue of load sensing power steering units, Regardless of the load sensing steerig system load pressure and pump flow changes, the priority valve can maintain supply steering flow is always equal to the product of steering wheel speed and steering displacement, to ensure the steering required flow.
We have Modulary mounting aAdhering to “SCat 3 Point Hitch How do I operate the PTO on my tractor? Prior to running the PTO, you will need your tractor to reach the starting RPM (revolutions per minute). Once the starting RPM has been reached you can begin operating the PTO.urvival by Quality, Development by Technology & Credit”, The company will constantly improve product performance to meet the increasing customer requirements in the rigorous style of work. nd Pipe mounting two kinds.
TYPE |
Max Input Flow L/Min |
Spring pressurecontrol bar |
P.EF port max pressure Mpa |
CF,LS port max pressure Mpa |
VLSA 40 |
40 |
4.5 7.0 10.5 |
20 In addition to our two sales offices in the US, EPG employs a nationwide network of sales partners who will provide expert technical support to your company. |
17.5 |
VLSA 60 |
60 |
4.5 7.0 10.5 |
20 |
17.5 |
More Products
Packaging & Shipping
OEM | yes |
Lead Time | 5-20 working days for less than 1500pcs |
Payment | L/C,T/T |
30% advance payment,the balance paid before shipment | |
Packing | Motor each have their own carton,the outer packing is a five-layer plywood boxes |
Shipping | 1)By air or sea or combined transportation |
2)Express:TNT,FEDEX,UPS,DHL |
Company Information
Our Services